On December 30, 2020, TaLiMu used a new type of multi-corrugated drill bit + vertical drill + constant wall thickness, low speed, high torque screw combination to drill to 4739 meters.
The first drilling of TaLiMu well started from the reamer + PV reaming-while-drilling combination at 20:00 on October 26, 2019, to the reamer and drill bit exiting the well at 10:00 on November 13, 2019.
two drill bits of 8-1/2 inch used in the TaLiMu Well. The ROP is higher than other short-well drill bits, and the wear of both drill bits out of the well is relatively small.
Changning H19 of Southwest Oilfield used a new type of impact-resistant one-face gear + vertical drill + constant-wall low-speed high-torque screw combination to drill to 1372 meters.